Is shortening your warranty’s defects period really saving you money?

Is shortening your warranty’s defects period really saving you money?

Often, it isn’t. And that’s not the developer’s fault. It just rarely gets explained properly.

Recently a developer asked us about cutting the defects liability period on their warranty from 2 years to 1. On paper it looks like sensible risk management: pass year two to the insurer and rest easier.

The catch is that this typically adds around 50% to the premium. Our advice was to keep the money.

Why it rarely stacks up

1. The cover doesn’t line up with the claims. From year 3, a warranty typically moves into pure structural cover. Bring that forward and the major snagging claimed in years one and two often falls outside it.

2. The consumer code still applies. Developers are expected to put defects right in the first two years, whatever the warranty says.

3. Insurers subrogate. If an insurer pays a year-two claim, it will usually pursue the contractor, engineer or architect. The liability finds its way back.

4. The Defective Premises Act has long reach. Since the Building Safety Act, claims can be brought for 15 years on new work and 30 years retrospectively. Closing the SPV early doesn’t end that, as Building Liability Orders can reach associated group companies.

The real gap is in the build contract

JCT rectification periods are typically 6 or 12 months, so developers feel exposed in year two. But a contractor can’t simply walk away when that period ends. It’s their duty to return and fix defects, and their liability survives it. A breach of contract claim runs for 6 years under a simple contract and 12 years under a deed, typically from practical completion. The Defective Premises Act applies to contractors too.

So, the more cost-effective fix usually sits in the contract:

· A 24-month rectification period

· A longer retention (we know, it’s a dirty word) or, better still, a retention bond

· The contract executed as a deed

There is a time and place for creativity

Reducing the period to 12 months, or even to zero, can be the right call, typically after an insolvency. Bringing the insurer in earlier can give homeowners real protection when the alternative is very little.

Questions the market should be asking

· Why do build contracts still run 6 or 12 month rectification periods when developers are expected to cover 24?

· Why does year one and two cover differ with provider, making like-for-like comparison impossible?

· Why are we comfortable selling a 50% uplift that barely changes a developer’s real risk?

Some providers might quote it and take the premium. It’s easy income.

At Advantage Home Construction Insurance, we’d rather explain what a product does and doesn’t do, then let the client decide. Yes, it costs us some money, but for us it’s the right thing to do, the client comes out ahead and they come back on the next scheme because we’ve built a partnership based on trust.

Still Have Questions? Let’s Talk!

Get in touch with our experts today!

Receive a quote today.

Advantage Home Construction Insurance (AHCI) provides structural defects insurance – operating nationally with offices in Warrington, London and Birmingham – offering development-related insurances and a service designed to give customers peace of mind.

Why Choose Advantage For Your Construction Insurance

Prefer to call or email us instead?

"*" indicates required fields

This field is for validation purposes and should be left unchanged.
Do You Need Support With Development Finance?*
Consent*